Rooftop solar in MP in 2026: PM Surya Ghar subsidy, MPERC net metering with Oct–Sep settlement, APPC credit, FY27 tariff, Indira Griha Jyoti and sizing.

Short answer: MP homes get the central PM Surya Ghar subsidy (up to ₹78,000); no state top-up was found. Net metering is allowed up to sanctioned load (max 500 kW) with monthly netting and annual settlement on an October–September year; surplus is credited at the APPC (about ₹2.14 per unit) against bills, not paid in cash. MPERC rejected grid support charges on rooftop solar. FY27 tariffs rose about 4.8% on average, and yields of about 1,460–1,530 units per kW a year make solar pay well (check current notification).

Subsidy

Scheme Amount
PM Surya Ghar, residential ₹30,000/kW up to 2 kW, ₹18,000 for the 3rd kW, max ₹78,000
PM Surya Ghar, housing societies ₹18,000/kW, up to 500 kW (3 kW per house)
State top-up None found
Fee waiver Draft MPERC amendment (May 2026) proposed waiving processing and meter-testing fees for PM Surya Ghar applicants

Apply on pmsuryaghar.gov.in with a vendor registered for your DISCOM: MPPaKVVCL (West, Indore), MPMKVVCL (Central, Bhopal) or MPPKVVCL (East, Jabalpur). See how to apply.

Residential tariff (FY 2026-27)

MPERC's FY27 order (26 March 2026) raised tariffs by about 4.8% on average, effective 13 April 2026.

Units per month ₹/unit
0–50 4.71
51–150 5.67
151–300 7.05
above 300 7.24
  • Fixed charge: up to 150 units, a flat ₹81 or ₹134 a month depending on category (verify); above 150 units, ₹30 per 0.1 kW of load derived from consumption
  • Electricity duty about 9% (≤100 units) to 12% (above), FPPAS about 5% (verify)
  • Indira Griha Jyoti: most households up to 150 units a month pay a subsidised amount (first 100 units at ₹100). If you are covered, solar savings on those units are small.

Rates from a secondary source citing the FY27 order (medium confidence). Check the bill.

Net metering rules

Item Madhya Pradesh (MPERC)
Regulation MPERC Grid Interactive Renewable Energy Systems Regulations (Revision-II), 2024 (RG-39 of 2024)
Capacity Up to sanctioned load, max 500 kW
Settlement Monthly netting, carry-forward, annual settlement on an October–September year
Surplus Credited at APPC of the year (about ₹2.14/unit), against the next bill, not in cash
Grid support charge Rejected by MPERC

Worked example: 3 kW in Indore

  • Use: 300 units a month
  • Energy: 50 × 4.71 + 100 × 5.67 + 150 × 7.05 ≈ ₹1,860, plus duty and FPPAS ≈ ₹2,150 a month
  • Removing most of this saves about ₹24,000–26,000 a year (fixed charge stays, and falls a little as consumption-based load falls)
  • Generation: 3 kW × 1,526 ≈ 4,580 units; surplus about 980 units credited at about ₹2.14
  • Price about ₹1.65–1.95 lakh, minus ₹78,000 subsidy
  • Simple payback ≈ 3.5–4.5 years. A 2.5 kW system would export less and pay back a little faster.

Practical points for MP

  • Yields: Indore 1,526, Bhopal 1,518, Jabalpur 1,519, Gwalior 1,464 units per kW a year.
  • Monsoon: July output in Indore and Bhopal is about half of March. The October–September settlement year means the credit balance is checked just after the monsoon.
  • Tilt: around 25° is optimal at MP's latitudes; many rooftop structures use 15–20° to limit wind load, with a small yield trade-off.
  • Bill credit only: since surplus is credited, not paid, oversizing gives you credits you may never use.

What to double-check

  1. Exact FY27 slab rates on the bill (order effective 13 April 2026)
  2. Fixed charge basis above 150 units
  3. Duty and FPPAS percentages
  4. Current APPC used for surplus credit
  5. Whether the fee-waiver amendment has been notified

How much solar for your city

System size needed to cover a given monthly use, from long-term Global Solar Atlas yields with a 5% rooftop derate (Sunlectric Studio data, Oct 2026). Round up to whole modules and check your roof.

City Yield (units per kW per year) 200 units/month 300 units/month 500 units/month
Indore 1,526 1.6 kW 2.4 kW 3.9 kW
Bhopal 1,518 1.6 kW 2.4 kW 4.0 kW
Jabalpur 1,519 1.6 kW 2.4 kW 3.9 kW
Gwalior 1,464 1.6 kW 2.5 kW 4.1 kW

Going solar in Madhya Pradesh: step by step

  1. Read the bill. Note the consumer number, tariff category, sanctioned load and phase, and add up 12 months of units. See how to read your electricity bill.
  2. Size to use. Divide yearly units by your city's yield (table above) and round to a practical module count. Check shadow-free roof space.
  3. Pick a registered vendor for MPPaKVVCL, MPMKVVCL or MPPKVVCL on pmsuryaghar.gov.in and get an itemised quote. Our installer checklist lists what to ask.
  4. Apply on the national portal before installation. Systems up to 10 kW are exempt from a technical feasibility study under the central consumer rules, and many DISCOMs give quick or deemed approval.
  5. Install with DCR modules, a matched inverter, a structure designed for local wind, proper earthing, a lightning arrester and SPDs.
  6. Net meter and inspection. The DISCOM tests and fits the bi-directional meter and records commissioning.
  7. Claim the subsidy by submitting bank details on the portal.

MP tip: because surplus is only credited against bills, show the customer the expected year-end credit and size so it stays small. Check whether the fee waiver for scheme applicants has been notified.

Talk to Sunlectric

Installers in MP: WhatsApp +91 89567 89307 (wa.me/918956789307) for today's landed price on DCR modules, inverters and BOS, dispatched from our Pune and Nagpur hubs. Homeowners: send your bill and we will suggest the right size so you do not build up unused credits. Learn net-metering design in the Academy policy module.

Related: net metering explained, solar for 300 units.

Sources

Questions people ask

Does Madhya Pradesh give a state subsidy for rooftop solar?

We found no state top-up for residential rooftop solar in 2026. Homes get the central PM Surya Ghar subsidy of up to ₹78,000. MPERC's May 2026 draft amendment proposed waiving processing and meter-testing fees for scheme applicants. Check the current notification.

How is surplus solar settled in MP?

MP uses net metering with monthly netting and carry-forward, and an annual settlement on an October–September year. Surplus is credited at the year's APPC (about ₹2.14 per unit in secondary sources) against future bills, not paid in cash.

Is there a grid support charge on rooftop solar in MP?

MPERC rejected grid support charges on rooftop solar. Check for any later order.

How much solar do I need in Indore or Bhopal?

Both model at about 1,520 units per kW a year. 300 units a month needs about 2.4 kW, so most homes install 2.5–3 kW.

Ask Sunlectric

A design to check, a price to beat or a subsidy file that is stuck? Our technical desk answers installers and homeowners on WhatsApp.

Monday to Saturday, 9:30 am to 7 pm

Or ask for a call back

This opens WhatsApp with your details filled in, ready to send.

Try “subsidy”, “string sizing” or “earthing”.